Underwriting

Catch Building Code Issues in Your Project Work

From jurisdiction-specific codes to drawing compliance, catching building code issues early prevents costly design changes and submission delays.

· 1 min read
CODE

IBC 2021
Building Code

DWG Floor_Plan_L2.pdf
Egress width
Occupancy load
IBC 2021 · 3 violations

Summary

Stepscale automatically selects the relevant building code for your project location and compares your drawings against it. Ask compliance questions in plain language and get code-referenced answers that catch egress, occupancy, and setback issues before design freeze.

Most of the expensive design changes start with small building code issues that aren’t caught early.

Stepscale helps teams catch these issues sooner by grounding building code questions in the exact jurisdiction and project context you’re working in.

How it works in Stepscale

Building codes tied to each project

Stepscale automatically selects the relevant code based on your project location. You can also select from a list of current building codes directly in Project Files. If a code isn’t available in the list, you can upload it as the default code to use in that project.

Code-aware answers while you prepare work

Ask building code or compliance questions in plain language. Stepscale compares your drawings against the relevant building code to identify discrepancies and flag areas of non-compliance.

What this enables

  • Catch code-related issues earlier, before design freeze or submission.
  • Reference exact code sections when reviewing or discussing compliance.
  • Reduce rework caused by late-stage interpretation errors.

If you're already using Stepscale, enable the right building code jurisdiction in Project Files and start asking questions. If not, we'd be happy to walk you through it.

“We are obsessed with helping our clients deliver accurate work and move forward with confidence.”