Skip to content

For general contractors

Submit every tender knowing your number holds up

Stepscale helps you read the specs, check your takeoffs, pull trade quotes together and sanity-check your number against past jobs. Your estimators still price it.

A superintendent and estimator reviewing drawings in a site office

Bid check · Library and Community Hub

Closes Dec 12, 2:00 pm

  • Your number is in range

    $14.8M vs $13.9M to $15.6M on 6 similar past jobs

  • 18 of 21 trades quoted

    Quotes from your inbox consolidated by trade

  • Mass timber has 1 quote

    Cedar Erectors only. Worth a second price.

  • Curtain wall differs by 6%

    Your takeoff 1,050 m², drawings A-401 to A-412 show 1,120 m²

What’s eating your estimating hours?

  • Understand the scope

    “We spend days in the specs before we know if we should even bid.”

    Stepscale reads the full RFP, specs and drawings and gives you the scope in one page: building, divisions, bonding, damages and the risks worth a second look.

    How Stepscale reviews scope

    Scope review · Library and Community Hub

    • Divisions 03, 05, 06, 07, 09 self-performed or subbed
    • 14-month schedule, phased occupancy
    • $5,000/day liquidated damages, no cap
    • Mass timber erector must be named at bid
  • Takeoff help

    “Takeoffs from 200 drawing sheets eat our whole week.”

    Stepscale finds the sheets that matter for each trade and gives rough quantities to check your takeoff against, so a big miss gets caught before the tender closes.

    How Stepscale helps with takeoffs

    Your takeoff vs the drawings

    • Concrete, foundations

      Yours 1,820 m³ · drawings 1,840 m³ · S-101 to S-108

    • CLT floor panels

      Yours 2,950 m² · drawings 2,950 m² · S-301 to S-306

    • Curtain wall 6% off

      Yours 1,050 m² · drawings 1,120 m² · A-401 to A-412

  • Sanity check

    “We find out our number was off after the bids are opened.”

    Bring your estimate in and Stepscale compares each division against similar jobs you have done, flagging anything well above or below, so you can take a second look before you submit.

    How Stepscale checks your number
    • 03 Concrete In range $2.41M
    • 05 Metals In range $1.86M
    • 06 Wood and timber 18% below past jobs $2.12M
    • 08 Openings In range $1.37M

    Compared with 6 similar projects, 2021 to 2025

  • Subtrades

    “Trade quotes all land the morning the bid closes.”

    Stepscale tracks every subtrade’s reply in your inbox, chases the ones that go quiet and levels the quotes by trade, so you know your number before the last hour.

    How Stepscale tracks subtrades
    • Mechanical Halden Mechanical $2.08M, lowest complete
    • Electrical Volt Systems $1.44M received
    • Mass timber Cedar Erectors No reply in 3 days
  • Past projects

    “Finding the right past jobs for a 60-page proposal takes forever.”

    Stepscale recommends the past projects that match on building type, size, value and owner, then writes the proposal around them.

    How Stepscale writes proposals
    • 94
      Union Street Library Mass timber · $12.6M · 2024
    • 89
      Eastview Community Hub Same owner · $9.2M · 2022
    • 84
      Riverside Rec Centre Phased occupancy · $16.1M · 2023
  • Hard bids

    “One missed addendum on a hard bid and we are disqualified.”

    Stepscale tracks every addendum, the bid form, bonding and the closing time, and will not let you mark the bid ready until each one is acknowledged.

    How Stepscale tracks bids

    Bid checklistCloses Dec 12, 2:00 pm

    • Addenda 1 to 3 acknowledged on bid form
    • 10% bid bond from surety
    • Addendum 4 posted today
    • Named mass timber subtrade
“It gives us a disciplined way to assess opportunities and spot risks early, and takes the scramble and late nights out of pulling a submission together.”
Graham McNally Graham McNally Principal, Toms + McNally Design

General contractors ask

How Stepscale helps contractors scope, price and win public work.

What is the best bid management software for general contractors in Canada?

Look for one platform that reviews scope, supports your estimators, consolidates subtrade quotes and produces the proposal. Stepscale does this for general contractors bidding public work across Canada.

Can Stepscale read construction drawings and specifications?

Stepscale reads the RFP, specifications and drawing set, summarizes the scope and risks, and gives rough quantities with the sheets they came from so you can check your takeoff. Your estimators still do the takeoff.

Can Stepscale check my construction estimate?

Yes. Stepscale compares your estimate, division by division, against similar projects you have done and flags anything well above or below, as a sanity check before you submit. It does not price the job for you.

How does Stepscale manage subtrade quotes?

Stepscale tracks subtrade replies in your inbox, follows up with trades that go quiet and levels quotes by trade so you can carry the right number.

Does Stepscale help with hard bids and stipulated price tenders?

Yes. Stepscale tracks addenda, bid forms, bonding and closing times, and keeps a checklist so nothing is missed before the bid goes in.

Try Stepscale on your current opportunity

Bring your opportunity files and we'll get you set up for a trial in 30 minutes.